RQ
SampleDPAP01
Riverside Quarter - Pilot Scheme
Aldgate Housing Partnership · one spine, four views, eight logs - the full ISO 19650 design register
ClientAldgate Housing PartnershipSiteRiverside Quarter, Quayside (sample)Naming conventionDPA-[ORIG]-[VOLUME]-[SPATIAL]-[TYPE]-[DISC]-[NUMBER]Prepared / CheckedPC / SB
Document ReferenceDPA-DAT-ZZ-XX-RP-X-000001
- Project Number
- DPA
- Project Title
- Riverside Quarter - Pilot Scheme
- Revision
- P01
- Author
- PC
- Date Created
- 03/06/26
- Deliverables
- 23 on the spine
Deliverables
23
on the spine
Complete
5
done and issued
In progress
10
active now
Not started
5
queued
Under review
2
awaiting check
Published
4
in the CDE
Open RFIs
4
not yet closed
Approved
4
approval status A
Master Data
The 43-column ISO 19650 deliverables register. Every view and log projects from this spine.
Spine
Views
Logs
Setup
| ISO 19650 Filename | Document Title | Type | Discipline | Assignee | Rev | CDE Status | Suit. | Status | Due |
|---|---|---|---|---|---|---|---|---|---|
| DPA-STN-ZZ-XX-DR-A-000001 | General arrangement plans | DR | Architecture | Studio North | C01 | Published | S4 | Complete | 12/05/26 |
| DPA-STN-ZZ-XX-DR-A-000014 | Reflected ceiling plans | DR | Architecture | Studio North | P03 | Shared | S2 | In Progress | 19/06/26 |
| DPA-STN-ZZ-XX-DR-A-000022 | Elevations and sections | DR | Architecture | Studio North | P02 | Shared | S2 | Overdue | 12/06/26 |
| DPA-STN-ZZ-XX-SC-A-000030 | Window and door schedule | SC | Architecture | Studio North | P01 | WIP | S1 | In Progress | 03/07/26 |
| DPA-STN-ZZ-XX-SP-A-000040 | Architectural specification | SP | Architecture | Studio North | P01 | WIP | S0 | Not Started | 24/07/26 |
| DPA-STN-ZZ-XX-TR-A-000031 | Curtain walling technical submittal | TR | Architecture | Studio North | P01 | WIP | S0 | Not Started | 17/07/26 |
| DPA-CBS-01-01-DR-S-000101 | Steel frame layout - Level 1 | DR | Structural | Cobalt Structures | C01 | Published | S4 | Complete | 05/05/26 |
| DPA-CBS-01-ZZ-DR-S-000102 | Steel frame layouts - Levels 2 to 4 | DR | Structural | Cobalt Structures | P02 | Shared | S2 | In Progress | 26/06/26 |
| DPA-CBS-ZZ-XX-SC-S-000120 | Structural connection schedule | SC | Structural | Cobalt Structures | P02 | WIP | S1 | Overdue | 28/05/26 |
| DPA-CBS-ZZ-XX-CA-S-000130 | Foundation calculations | CA | Structural | Cobalt Structures | P01 | Shared | S2 | Overdue | 05/06/26 |
| DPA-MME-ZZ-XX-DR-M-000201 | Mechanical services layout | DR | Mechanical | Marsden MEP | P02 | Shared | S2 | In Progress | 26/06/26 |
| DPA-MME-ZZ-XX-SP-M-000210 | Mechanical specification | SP | Mechanical | Marsden MEP | P01 | WIP | S1 | In Progress | 03/07/26 |
| DPA-MME-ZZ-XX-CA-M-000220 | Heat loss calculations | CA | Mechanical | Marsden MEP | P01 | WIP | S0 | On Hold | 19/06/26 |
| DPA-MME-ZZ-XX-DR-E-000301 | Small power and lighting layouts | DR | Electrical | Marsden MEP | P01 | WIP | S0 | Not Started | 17/07/26 |
| DPA-MME-ZZ-XX-SC-E-000310 | Luminaire schedule | SC | Electrical | Marsden MEP | P01 | WIP | S0 | Not Started | 24/07/26 |
| DPA-SFE-ZZ-XX-RP-H-000401 | Fire strategy report | RP | Fire | Sentinel Fire | C01 | Published | S4 | Complete | 30/04/26 |
| DPA-SFE-ZZ-XX-DR-H-000410 | Fire compartmentation plans | DR | Fire | Sentinel Fire | P02 | Shared | S2 | Overdue | 22/05/26 |
| DPA-SFE-ZZ-XX-DR-H-000411 | Fire stopping details | DR | Fire | Sentinel Fire | P01 | WIP | S0 | Not Started | 10/07/26 |
| DPA-PJY-ZZ-XX-DR-J-000501 | Reception joinery details | DR | Joinery | Pennine Joinery | P01 | WIP | S1 | In Progress | 10/07/26 |
| DPA-PJY-ZZ-XX-SC-J-000520 | Door and ironmongery schedule | SC | Joinery | Pennine Joinery | P02 | Shared | S2 | In Progress | 01/07/26 |
| DPA-DAT-ZZ-XX-MS-X-000601 | Design responsibility matrix | MS | Coordination | dpow | C01 | Published | S4 | Complete | 17/04/26 |
| DPA-DAT-ZZ-XX-PR-X-000610 | Stage 3 design programme | PR | Coordination | dpow | P03 | Shared | S2 | Overdue | 12/06/26 |
| DPA-DAT-ZZ-XX-RP-X-000620 | Weekly design report - W09 | RP | Coordination | dpow | P01 | Shared | S2 | Complete | 01/06/26 |